1
/
of
7
NeoG
Neo G Opti-Heal Silicone Foam Dressing with Border - Absorbent, Adhesive Foam Wound Dressing for Cuts, Ulcers, Diabetic Wound, Bedsore Wound Care, Burns, Surgical - Island Dressing 4x4-4 Pcs
Neo G Opti-Heal Silicone Foam Dressing with Border - Absorbent, Adhesive Foam Wound Dressing for Cuts, Ulcers, Diabetic Wound, Bedsore Wound Care, Burns, Surgical - Island Dressing 4x4-4 Pcs
Regular price
$25.58 USD
Regular price
$25.58 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
About This
- LOOKING FOR A HIGHLY ABSORBENT MEDICAL FOAM DRESSING FOR SURGICAL, BEDSORE WOUND, ULCER OR BURN? Neo G silicone foam dressings for wounds have been clinically developed to provide hospital grade adhesive bandages to use at home.
- FASTER HEALING TECHNOLOGY foam dressing with adhesive border creates a moist environment, which helps accelerate healing and reduce pain and scarring. Ideal for cuts, pressure ulcer wound care, bed sore bandages, wound care for diabetics, postsurgical wounds.
- HIGHLY ABSORBENT MATERIAL absorbs and holds exudate within the silicon foam dressing 4x4. Wound contact layer features a high perforation rate for fast wicking and minimal risk of skin damage. Foam wound care effectively soaks up moderate-to-heavy drainage.
- SAFE & GENTLE ON SKIN: The perforated silicone wound contact layer prevents the foam bandages for wounds from sticking to the wound and reduces pain during dressing changes. Silicone wound dressing suitable for sensitive skin. Breathable.
- WATERPROOF & FLEXIBLE: The 360° seal is showerproof and protects the wound from dirt and germs, helping to prevent infection. Repositionable and flexible for easy wound monitoring & comfort during wear.
Share
